Rognlin’s is ahead of schedule on their portion of the rigging project. This project includes new catwalks, ladders and other structures which will make it easier and much safer for the stage people to handle the drops, lights, curtains etc. These photos were taken today. Electrical work will be starting soon, and Stagecraft will be moving in in early December to start work on their portion (rigging, line sets, drops etc.)
The top photo is a new platform that takes place of the old pinrail system (part of which is left on display backstage).
The bottom photo is looking almost straight up to the highest catwalk, showing the new access ladder on the left.